Most Reliable Pool Construction Services in Dubai
Done properly, by our own team.
A Dubai nursery and landscaping company with 35 people in-house. We visit within 24 hours and quote within 24 hours of the visit.
How it works
Same process whichever service you need.
-
1
Send photos on WhatsApp
2 minutesA few photos and rough dimensions tell us the access, the levels and what is already there.
-
2
Free site visit
Within 24 hoursWe look at the space, confirm what the job actually needs, and answer questions on the spot.
-
3
A written quote
Within 24 hours of the visitA fixed price against a defined scope, so you are not comparing guesses.
-
4
Our own team does the work
Scheduled with you35 people in-house rather than subcontractors, so the people who quoted are the people who turn up.
Or use the form at the top of this page and we will call you.
More of our work
See the pools we have built
Leave your number and we will send the album of pools, plunge pools and water features we have built across Dubai.
- Pools built with the garden around them
- What each build involved, stage by stage
- A guide price for your space
More about this service in Dubai
A swimming pool is a sequence, not a single job, and the sequence is what sets the timeline. Excavation, structural work, waterproofing, tiling and coping, plumbing and filtration, then the surrounding hardscape and planting each have to finish before the next begins. Concrete needs curing time that cannot be shortened by adding people to the site, which is why honest pool schedules are longer than most quotes suggest.
We charge for design as a paid first stage. The drawings are worked out properly before anyone prices concrete, and once you approve the design we issue a fixed quote for the build. If you award us the project, that design fee is adjusted into the project cost, so you are not paying for it twice.
Pool construction in Dubai generally needs authority and community approvals, and the requirements differ between developments. We confirm what applies to your plot during the site assessment rather than discovering it mid-build. Access for excavation machinery is the other thing we check early, because it often decides how the work is staged on a villa plot.
The pool, the terrace around it and the planting that frames it are drawn as one scheme rather than coordinated between separate contractors. See pools and water features for the wider service, hardscape for the surrounding paving, and pool cleaning for upkeep once it is handed over.
Pool and water feature questions
Longer than most people expect, because the sequence cannot be compressed. Excavation, structure, waterproofing, tiling and surrounding hardscape each finish before the next begins, and concrete needs curing time that cannot be shortened. Your schedule is confirmed in writing once the design is approved.
Design is a paid first stage. Once you approve it we issue a fixed quote for the build, and if you award us the project the design fee is adjusted into the project cost.
Pool construction generally requires authority and community approvals in Dubai, and requirements differ between developments. We confirm what applies to your plot as part of the site assessment.
Yes, and it is better that way. The pool, the hardscape and the planting are drawn as one scheme rather than coordinated between separate contractors. See pools and water features.
Regular water balancing, filtration checks and cleaning. We can cover that on a schedule through pool cleaning once the pool is handed over.
Reach out to our team
Get in touch with our experts